The company has been awarded an EXIM bank fund project of "LPG Bottling Plant and Bitumen Storage facility" to be executed on EPC basis, at Beira, Mozambique.      The company has been awarded the prestigious project of "MHNRD Phase III Pipeline Project" of ONGCL in consortium with M/s Valentine Maritime Limited, Abu Dhabi to be executed on EPC basis at Mumbai High.     The company has appointed Mr. Mahabala Gopala Karkera as Chief Executive Officer w.e.f 01st October 2014.       

Equipments

1. Major Equipments/Tools
A) Cold Cutting Machine 02 Nos.
B) Hydraulic Torque Wrench
Hy-30xlct Up To 155mm Nut Size
01 No.
C) Nitrogen Generator 15m3/Hr 01 No.
D) Air Compressor (25 CFM) 01 No.
E) Boiler 01 No.
F) Power Generator 125 KVA/ 82 KVA 04 Nos.
G) Welding Rectifier 600 AMPS
    400 AMPS
10 Nos.
70 Nos.
H) Welding Transformer 08 Nos.
I) Welding Generator –
Advani Oerlikon Model
02 Nos.
J) Tig Welding Units 06 Nos.
K) Electric Motor Driven
Fire Water Pump 130m3/Hr
02 Nos.
L) Diesel Driven Fire Water
Pump 450 M3/Hr
01 No.
M) Air Winch 3.5M/T 02 Nos.
N) Air Blower 06 Nos.
O) Hole Punching Machine 01 No.
P) Pipe Cutting Saw 01 No.
Q) Plasma Cutting Machine 01 No.
R) Hydrotesting Pump 03 Nos.
S) Bevelling M/C 03 Nos.
7. NDT and SR Equipments
A) Dp Set (Spray Type) (Consumable) As Per Requirement
B) Ultrasonic Thickness Meter 02 Sets
C) MPI (East West) 02 Nos.
D) Ultrasonic Testing Machine
    EX-10 of ELC
02 Nos.
E) Gamma - Ray Equipment
    Teletron SU 100
02 Nos.
F) Digital Hardness Tester 02 Nos.
G) Heat Treatment / Stress Relieving units
    With Recorder, Panels, Accessories etc.
06 Nos.
H) Ultrasonic Testing Machine 01 No.
I) Hardness Tester (TH-130) 01 No.
J) D Meter 01 No.